This table shows the list of mitigation actions present in the active edition. To view the details of each action, click on the name of the action. To facilitate the search you can use the filter on the type of action.

National identifier Action name Inclusion as component in the NDC Action type Status Responsibles
PaM_54_AG 40 MW Dakhla wind farm Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_58_FO Activities between 2010 and 2020. Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_39_TR Application of CO2 emission performance standards for new passenger cars and new light commercial vehicles Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_53_AG Argan tree planting program Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_12_IN Biomass valorization program in industry Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_36_TR Bonus-Malus System Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_47_AG Cactus Planting Program (Tranche 1) Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_52_AG Cactus Planting Program (Tranche 2) Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_23_PH Capture and recovery of CO2 from phosphoric chimneys Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_44_AG Citrus program (slice 1) Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_20_PH Cogeneration Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_04_EP Combined cycle power plants by 2020 Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_05_EP Combined cycle power plants by 2030 Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_45_AG Date palm program (tranche 1) Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_50_AG Date palm program (tranche 2) Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_60_FO Degradation avoided (conditional part). Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_56_FO Degradation avoided (unconditional part). Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_38_TR Eco driving Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_59_FO Ecosystem restoration activities (conditional part). Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_55_FO Ecosystem restoration activities (unconditional part). Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_28_BU Energy efficiency for new building envelopes Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_29_BU Energy efficiency in tourist accommodation establishments Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_09_IN Energy efficiency program in industry Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_32_BU Energy efficiency program in public lighting Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_34_TR Extension of the Casablanca tramway Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_33_TR Extension of the Rabat tramway Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_43_AG Fruit tree growing program (phase 1) Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_49_AG Fruit tree growing program (tranche 2) Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_03_EP Hydroelectric power plants by 2020 Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_06_EP Hydroelectric power plants by 2030 Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_27_BU Implementation of Minimum Energy Performance Standards (MEPS) for air conditioners. Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_10_IN Implementation of performance and energy rules for electric motors greater than 75 kW Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_26_BU Implementation of the Minimum Energy Performance Standard (MEPS) for energy-efficient refrigerators. Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_35_TR Improving environmental standards for vehicles Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_31_BU Installations of photovoltaic solar panels, by 2030, for self-consumption in the residential and tertiary sectors Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_41_WA Mechanical-biological treatment and co-incineration of household waste Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_24_BU National Development Plan for Solar Water Heaters from 2010 to 2020 Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_30_BU National plan for the development of solar water heaters post 2020 Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_46_AG National programme for the development of routes and regulation of transhumant flows – Phase 1 Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_51_AG National programme for the development of routes and regulation of transhumant flows – Phase 2 Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_02_EP National solar plan by 2020 Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_08_EP National solar plan by 2030 Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_01_EP National wind plan for 2020 Yes
  • Project or program
Open
  • Manager: admin
  • Controler: admin
  • Approver: admin
PaM_07_EP National wind plan for 2030 Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_11_IN Natural gas in the industrial sector by 2030 Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_42_AG Olive gronwing program (tranche 1) Yes
  • Policy
Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_48_AG Olive growing program (tranche 2) Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_25_BU Program for the generalization of LED lamps in the residential sector on the horizon Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_13_IN Program for the installation of renewable energies in industrial infrastructures Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_15_CE Recovery of WWTP sludge Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_16_CE Recovery of household waste Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_37_TR Renewal and Breakage Program Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_19_PH Slurry pipeline Khouribga - Jorf Lasfar Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_22_PH Solar drying of phosphate Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_21_PH Solar energy Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_61_FO Strengthening the resilience of socio-ecosystems in vulnerable areas (conditional part). Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_57_FO Strengthening the resilience of socio-ecosystems in vulnerable areas (unconditional part). Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_40_WA Valorization of GHGs from WWTPs Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_18_CE Valorization of fly ash Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_17_CE Valorization of olive pomace Yes Open
  • Manager: admin
  • Controler:
  • Approver:
PaM_14_CE Valorization of used tires Yes Open
  • Manager: admin
  • Controler:
  • Approver:

Cette plateforme est appuyée par le PNUD Maroc et le FEM via le projet CBIT

Image removed.

Image removed.

Image removed.